

2026 Road Improvement Program
Consists of improvements to Buttonwood Lane from Rumson Road to Club Way, Broadmoor Drive from Rumson Road to the cul-de-sac and Thornton Way mid-block to Broadmoor Drive
2026 Road Improvement Program FAQ
What streets are included in the Road Improvement Program?
This year’s Road Program will consist of improvements to Buttonwood Lane from Rumson Road to Club Way, Broadmoor Drive from Rumson Road to the cul-de-sac and Thornton Way mid-block to Broadmoor Drive. At this time, the 2026 Road Improvement Program does not include Buttonwood Lane East, Rivers Edge Drive and Harbor Drive.
What is the proposed scope of work?
Buttonwood Lane: The Contractor will televise select portions of the drainage system to facilitate isolated pipe repairs and/or pipe replacement. The balance of work consists of the replacement of concrete curbs, restoration of driveways, restoration of lawns and landscaping behind the curbs and milling and paving.
Broadmoor Drive: New drainage piping will be installed to Thornton Way intersection. The balance of work consists of the replacement of concrete curbs, restoration of driveways, restoration of lawns and landscaping behind the curbs and milling and paving.
Thornton Way: The work consists of the replacement of concrete curbs, restoration of driveways, restoration of lawns and landscaping behind the curbs and milling and paving.
What company was awarded the construction contract?
The Governing Body awarded a contract to L&L Paving of Farmingdale at a Special Meeting of the Mayor and Council on August 25, 2026. L&L Paving was the lowest cost, most responsive bidder out of all the sealed bids received by the Borough for the project. L&L Paving has successfully completed prior roadway projects with the Borough.
Will a representative of the Borough be present during construction?
The Borough’s Engineering Department will be present during construction. Throughout the project, our Superintendent of Public Works will also periodically be on-site.
What is the project start date?
A specific start date has not been established. This will be updated as the information becomes available.
What is the project duration?
The entirety of the project is contracted for 3 months, but due to inclement weather, unanticipated field conditions, or expansion of the project scope additional time may be warranted.
What are the working hours?
The working hours for the project will be Monday to Friday, 7:00 am to 5:00 pm, with some exceptions due to unforeseen conditions. The Contractor may arrive to the job earlier than 7:00 am, but should not be operating equipment. If this is a frequent occurrence, please contact Brett Hunger (Project Manager) or David Marks (Borough Engineer).
Will the street be open during construction?
The street will be closed to through traffic while work is underway. We ask that you avoid the active work areas to the greatest extent feasible. Access to your home during the work day may be restricted based on the work
for that day. Access will generally be restored by the end of the work day. Parking should be accommodated on nearby streets. Due to the narrowness of Buttonwood Lane, it is expected the road will be closed to all traffic within the work areas during active working hours.
What is the daily impact to my property?
The daily impact to your property should be minimal. However, during the milling and paving operation, access to your home will be restricted. While drainage and new curbs are being installed immediately in front of your home or the adjacent property, access will be temporarily restricted to allow for the work. If a new depressed curb is installed across your driveway, access will be restricted for 3 to 5 days to allow for the concrete to fully cure. Please park in your driveway when possible or on the street outside of the work area limits.
My sprinklers were damaged, what should I do?
If your sprinkler system is damaged during the construction process, please either contact a supervisor from the Construction Company, or contact Brett Hunger (Project Manager) or David Marks (Borough Engineer). Per the contract, the Construction Company is required to repair all damages at their expense. Please afford the Construction Company the first opportunity to make the necessary repairs.
To reduce the extent of sprinkler damages, please mark your sprinkler heads if they are within 3 feet of the curb or road edge when construction activity approaches your property. The markers will get displaced by lawn care contractors if you locate the sprinkler heads too soon.
Will my driveway be impacted by the construction?
If a new apron is installed or depressed curb is extended across your driveway, there will be temporary impacts for the construction. The Contractor will repair the driveway with like materials and finishes to the greatest extent possible. We do not seal coat asphalt driveways. The extent of how far back a driveway is repaired is a function of driveway material type and grading to maintain positive drainage flow.
Is it my responsibility to restore my lawn behind the sidewalk or between the curb and sidewalk?
No, the contract with the Contractor includes the restoration of lawn behind the sidewalk and between the curb and sidewalk. We ask that you please water the restored lawn areas regularly or as needed until it is established. Neither the Borough nor Contractor will be responsible to replace lawn that is not adequately cared for.
I would like my entire driveway or sidewalk to my home replaced. Can the Borough’s Contractor complete that work?
Yes, the Borough’s Contractor can be hired to complete work on your private property. That work would need to be contracted directly between you and the Contractor. The Borough should be made aware of the proposed work, but the property owner is fully responsible for payment and oversight.
Who should I contact with additional questions:
Brett Hunger
Project Manager
732-842-3300 bhunger@rumgsonnj.gov
David Marks
Rumson Borough Engineer
732-842-3300 dmarks@rumsonnj.gov
In case of emergency, please contact Rumson Police Department at (732) 842-0500
Project Gallery

